Jamie and Matt have been working the tween decks lately. The caulking needed to be replaced and many of the seams were so open that they needed feathers. We’ll start with Jamie working out the widths they’d need to feather the seams.

2014-IMG_0232

He uses wood scraps of different measured thicknesses to measure the gap width along each seam.

2014-IMG_0233

The nail set crosswise in the scrap keeps the scrap from falling through the gap.

With these measurements in hand, they make up a whole bunch of feathers to fill the gaps. The feathers are snug at the bottom of the deck planking but have a bevel along the top two thirds to allow for caulking.

2014-Deck Feather

After the feathers are installed, it’s lots of caulking. We use oakum (hemp fiber treated with pine tar) to caulk.

2014-IMG_0520 2014-IMG_0679 2014-IMG_0627

You can see the feathers alongside the caulking.

2014-IMG_0675

Roger and Rob, both master caulkers, came down to help.

2014-IMG_0708

Driving the caulking into the seam is a two step process. First the caulking is set into the seam using a series of short tucks that are driven lightly with the mallet and iron.

2014-IMG_0713

Then the caulker goes back over the area he just tucked and drives the caulking hard down into the seam.

2014-IMG_0710

Once your supply of oakum runs out, it’s back to the shop to spin some more. The oakum comes from the supplier in thick cords, and the crew pulls and rolls these cords between their palm and thigh to create a consistent, thinner rope.

2014-IMG_0735

It’s not a bad place to be on a cold day with the heater and radio…

Once the caulking is driven, we want to protect it from dirt, water, and any other contamination as quickly as possible. This is particularly important in the areas where museum guests will be walking. The final step in caulking the decks is to seal the seam with hot (really, really hot!) tar. We start by paring the feathers down to the level of the driven caulking.

2014-IMG_0762 2014-IMG_0763

Rob got the tar good and hot (outside the boat of course), and Jamie and Matt loaded up their tar funnels.

2014-IMG_0767 2014-IMG_0772

Pouring the tar into the seam is tricky work. When it first comes out of the pot, it’s as thin and runny as water.

2014-IMG_0774

Matt and Jamie move along the seam, trying to get just enough tar to completely fill the seam, but not so much as to puddle out around it. It’s tricky work. As the pour progresses, the tar cools and they get a brief sweet spot of time where the flow is steady and controllable, like a thin milkshake.

2014-IMG_0776

Soon, the tar cools enough to stop flowing easily, and it’s back to the pot for a refill.

After all the seams are filled we let the tar cool overnight. Given the frigid temps, we could have probably gotten away with just an hour or so.

2014-IMG_0797

The next day, we scrape off the excess tar, leaving a nice straight seam.

2014-IMG_0798

The seams to the right have been scraped.

Once the primary traffic areas have been addressed, it’s back to work on the perimeter of the tween deck.

2014-IMG_0877 2014-IMG_0878

Next up, more new masts!